Milestones

Milestones

  • Obtained ISO Certifications for QMS, EMS and OHSAS.
  • Turn-over soared from US$ 15 Million in 2013-14 to US$30 Million in 2018-19.
  • Starting with total area of 122,000 Sq. Ft. in 2007 at the present premises, company has increased the covered area to 282,000 Sq. Ft. & total area to 500,000 Sq. Ft. by the end of 2018. Further augmentation is in progress.
  • Augmented manufacturing capacity to 48,000 MT per annum.
  • Successfully type tested 400kV Twin & Quad Hardware Fittings for Transmission Line at CPRI, Bangalore.
  • Successfully  type  tested  Sub-Station  Hardware  Fittings  up  to  66/132/220kV  at  CPRI, Bangalore for almost all Altitude Levels & Clamp & Connectors at ERDA.
  • Inducted CNC Machines for Cutting & Punching of Steel Flats, Angles & Channels. Plasma for Plate Cutting, VMC for Die Making.
  • Introduced 1500KN Horizontal Tensile Testing Machine
  • Received  accolades  &  appreciation  from  Indian  Premier  Power  Utilities  as  a  Quality Manufacturer
  • Obtained approvals from Powergrid (Upto 400kV), NTPC, NHPC, & Various State Utilities for manufacture & supply of Transmission & Distribution Line Materials.
  • CORE approval obtained for Railway Electrification for supply of Ferrous & Non-ferrous Accessories and SPS items.
  • Achieved ability to manufacture test & supply complete range of Power Transmission, Distribution & Pole Line Materials, Railway Electrification and Telecom Line Materials simultaneously.
  • Achieved ability to conduct In house Type/Roune/Acceptance tests up to 400kV & above range, standalone and with Insulator string.
  • Exercised adequate measures for Process Control, Effective Quality, Safety and Environment  Management.